shimpster Posted February 15, 2023 Report Share Posted February 15, 2023 Hello, I'm finishing my lower level and before I have the drywall go up I want to run the proper electrical from my Sub-Panel to the exterior wall of the home where I plan on putting my equipment pad. I was going to pull 1 run of 125' 8/3 Type NM-B Cable with Ground. What do you think? Should be good, no need for 6/3?? My future plan is to install a Fiberglass pool, gas heat, auto cover, and booster pump for a pool cleaner. Thanks for any input. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.