Hello,
I'm finishing my lower level and before I have the drywall go up I want to run the proper electrical from my Sub-Panel to the exterior wall of the home where I plan on putting my equipment pad. I was going to pull 1 run of 125' 8/3 Type NM-B Cable with Ground. What do you think? Should be good, no need for 6/3?? My future plan is to install a Fiberglass pool, gas heat, auto cover, and booster pump for a pool cleaner.
Thanks for any input.