Refinishing Pool - A Quick Question


Recommended Posts

We have gotten a few quotes to refinish our pool. How long should this process take? One quote we received was for a full week, another quote said the job would be completed in 3 days. This quote was obviously cheaper but I am concerned that they aren't "doing it right". They want 1 day to drain the pool, one day to prep it, and on the 3rd day they will spray it with the new surface and fill it with water the same day. Does this sound right?

Link to comment
Share on other sites

That is generally how long it takes. The other guy may want to wait and extra day for the bond coat(prep). Did you inquire as to what the extra days are for? Some guys have extra steps; sand, or water blasting. If there is no bond coat used, the extra time could be for a couple of guys to rough up the surface mechanically.

Link to comment
Share on other sites

  • 4 years later...

We recommend and use the Dustless Blasting system with crushed glass or sand. The DB system mixes water with the media to keep the dust down so it doesn't get all over everything else around the house / yard. With the DB system and crushed glass or sand, we can remove the plaster very efficiently.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...