nehpd Posted June 1, 2017 Report Posted June 1, 2017 I am expecting delivery of Beachcomber "Copper Cove" soon. It is rated at 55 amps and calls for #6/3 and no longer a length of wire than 70'. Well, That aint happening because the shortest distance that I can possibly run service from the main breaker box to a cut-off to the tub is about 140'. So, my plan (indeed I have implemented most already...I guess I'm just looking for reassurance or a wave-off if I am asking for trouble) is to run #6 wire (red, white, black, and green) all in individual insulation within a 1" PVC conduit from the GFCI breaker cut-off to the tub itself. That distance is 50'. This part is done. So, now I am trying to decide between using more 6/3 as above for the 75' run from the main breaker (240v/2 pole) to the GFCI cut-off, or if I should use 4/3 for that run. My hot tub shut-off has room for not only the 60-amp hot tub breaker but also 2 additional 20 amp GFCI breakers, both of which I intend to run a couple ceiling fans, a few LED light fixtures, and a couple of wall outlets from one day in the future when I get my patio built. If it was not for this intention, I think 6/3 the entire length may just make it...but that isn't going to be the case. Also, I am pouring my pad this week and I have heard I should ground the re-bar in the pad with a grounding rod and also ground the tub itself to that same bar. I have heard to also ground the Cut-Off panel with a copper rod, and of course make sure a ground wire goes from the hot tub to the cut-off panel to the main breaker. How does this sound and does anybody see a better way of doing things? Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.