Considering the need to have the pump running while the salt chlorinator is operating it seems I need to either (i) determine if I can run it off the pump's timer (this would ensure the two systems are synched), or (ii) get a standard timer, power the salt chlorinator through it, and synch it to pump's timer. In theory the latter works, but it seems like two different timer systems creates a potential fail point. I'm hoping there's a better option. Thanks for thinking and sharing thoughts on this.