I want to use a 2 speed pump on my new pool in Miami with only 5000 gallons which will require high speed for about 2 hours per day. However, PB advises that that is not enough time for the SWG to make enough chlorine in the summer thus requiring up to 4 hours at high speed. As you know Miami is very hot and rainy in the summer?
Would going to a bigger capacity SWG (say APURE 700 to the APURE 1400) create more chlorine in a shorter time period?
Thanks, Michael