Hi. First post, but I've been doing a lot of reading here. I have a Coleman 471 being delivered on Sunday, and the site I'm looking to place it on consists of concrete pavers with about a 3/4 inch drop from one side to the other across the 88" length of the tub. Doesn't appear to be compound...just an even, gradual drop.
Is a 3/4 inch drop enough to warrant building a platform like sinker's? That's about 1/10 inch per foot. I read somewhere else (I think) that 1/16 was the max acceptable.
Thoughts? Thanks in advance.
J.
(Funny, looking again, I guess I read the 1/16 thing here....)