Philip Posted July 17, 2023 Report Posted July 17, 2023 The average temperature in my area, Rancho Mirage, CA, is around 90 degrees Fahrenheit in August when the pool resurfacer wants to do the work. I have found sources that state that above 75 degrees the plaster will dry too fast and cracks may occur. Should I postpone having the work done until the temperatures are lower? Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.