naples378 Posted March 13, 2009 Report Share Posted March 13, 2009 In the process of DIY pool and have been reading and learning a lot from this site, thanks. I am now at the phase of installing my coping and waterline tile. Question what goes on first? Coping is standard brick 4x 8 and 6x6 waterline tile. I know the beam has to be leveled just not sure on how to do it. First lay and level coping or level tile; (after highest point found) . Any feedback would be appreicated. It is a shotcrete shell. Thanks again. Quote Link to comment Share on other sites More sharing options...
H2O Bear Posted March 13, 2009 Report Share Posted March 13, 2009 Coping Tiles generally go on first then the tile. If there is a slight spacing difference the grout will hide it. Quote Link to comment Share on other sites More sharing options...
naples378 Posted March 14, 2009 Author Report Share Posted March 14, 2009 Coping Tiles generally go on first then the tile. If there is a slight spacing difference the grout will hide it. 'H2O Bear' thanks for the guiding me in the right direction; should I build the beam up to level then coping or set first brick level and use that as my guide? Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.