Firewire Posted October 2, 2008 Report Share Posted October 2, 2008 Here is a 3 day shot of the pad we had poured yesterday. 6" with rebar/wire mesh combo and a slight drainage slope (it's under 1 " irregardless of what my photo skills look like ). It looks like a hill, but in person the pad is nearly level. I will have some build up work to do on the right side of the pad. The concrete guy said he does a less than 1" slope on all his hot tub pads for drainage. Then I get on here and see all sorts of posts about it needing to be perfectly level and forgot the drainage! Yikes. Oh well, I will just deal with it as it is! The swim spa is about 17' X 8' so we will have plenty of room around it. I had no idea the damage a bobcat and concrete truck can do to a yard. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.