I done most of the labour myself, stripped it and moved to New location by myself - built a new frame with wood in region of £100, £150 to get lifted in - I removed the pumps and blower unit and took them apart and tested them. £200 for a new power supply to run the tub, £100 for new concrete base and £100 for drainage
Just have to insulate and PVC panel the sides and I'm done