Well like I said we went with the Grandee by Hot Springs. I bought the upright lifter. It only has to have 7" of clearence to open. I dont have a issue with clearence, but it will save space on my patio should I never want to enclose the spa. I also got a towel holder and a hand rail. I passed on a step, because I can make one from wood. I'm in the process of installing a 14' x 14' x 6" thick concrete slap on a 4" bed of granular, next to my wood deck. Therefore, the concrete pad can serve as both a foundation for the spa or a concrete patio addition to the wood deck. That way, if I move and take the spa, the concrete pad can still remain as a patio. I am going to run a 1" pvc conduit under the slab for electrical wiring. Hopefully, this all I need? Any thoughts??