Gavin Posted January 12, 2010 Report Posted January 12, 2010 Hi Guys I want to get into the pool renovation biz and I have a possible tiling job. I'm not actually doing the tiling but I have someone who is a tiler and we will work together. I was wondering what % to add to his quote which would be reasonable compensation for me finding the job and coordinating with my tiler..I'll be overseeing the job. I think 25% would be too steep and I don't want to bid too high. would 15% be reasonable? what do you guys think? Thanks. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.